Deposits, milestones and final invoices: billing a project in stages
October 9, 2026 · Updated November 9, 2026
Few service businesses can afford to do three months of work and then send one invoice. Billing in stages, with a deposit up front, payments at milestones and a final invoice on completion, keeps cash moving and keeps clients committed. It also adds bookkeeping: several invoices for one piece of work, deposits that must be deducted exactly once, and a running answer to "how much of this project have we billed?"
This post covers the common structures, how to model them on a project board, and the mistakes that cause awkward conversations with clients.
Three common structures
1. Deposit and balance
The simplest: an invoice for a share of the fee at signing (say 30–50%), and one for the rest at completion.
- Good for: short projects, events, productions, fixed-scope work.
- Watch out for: scope changes during the project. The balance is no longer just "the rest of the fee". It is the rest of the fee plus agreed changes.
2. Milestone billing
The fee is split across defined milestones: discovery, design approval, build, launch. Each milestone has an amount, and an invoice goes out when the milestone is reached.
- Good for: longer projects with clear stages, consultancy engagements.
- Watch out for: vague milestones. "Design approval" needs a definition both sides agree on, or the invoice becomes a negotiation.
3. Progress billing
Invoices go out on a schedule (typically monthly) for the share of work completed in that period, either as a percentage of the total or as time and materials.
- Good for: long engagements, retained teams, construction-like work.
- Watch out for: over-billing early. Billing 40% of the fee when 25% of the work is done invites disputes later.
Many projects mix these: a deposit, then monthly progress invoices, then a final invoice that settles everything.
The project versus the invoices
The key modeling decision is to separate the agreement from the invoices.
- The agreement is one thing: a project with a total fee, a currency, a payment schedule and a list of agreed changes.
- The invoices are several things, each with its own date, amount, number and payment status.
On a monday.com board, that means one item for the project and one billing item per invoice, linked to it. Don't try to bill a project several times from a single item. An item has one status column and one invoice-number column, and they can't describe three invoices at once.
Modeling it on a board
Projects board. One item per project, with columns for:
- client and client email;
- currency;
- total agreed fee (number);
- payment schedule (a short text, such as "30 / 40 / 30");
- billed to date and paid to date (summaries of the linked billing items, if you set them up).
Billing board (or a billing group). One item per invoice, with:
- a link to the project;
- stage (Deposit, Milestone 1, Milestone 2, Final);
- the lines as subitems: what is being billed in this stage;
- billing status (Ready to bill, Invoiced, Paid);
- invoice number, written back once the invoice exists.
For the column-by-column version of the billing board, see how to set up a monday.com board for invoicing.
The final invoice: where the mistakes happen
The final invoice has to settle the whole project. Most staged-billing errors happen here.
Deducting the deposit, once. If the deposit was a separate invoice that the client has already paid, the final invoice must not bill the full fee again. There are two common ways to show this, and which one fits depends on your accounting system and your accountant:
- bill only the remaining amount, with a line description that makes the arithmetic visible ("Final 30% of agreed fee"), or
- bill the full fee and show the deposit already invoiced as a deduction, if your system supports that cleanly.
Either way, write the arithmetic down on the board so whoever bills can check it: total fee, plus agreed changes, minus everything already invoiced, equals this invoice.
Including the changes. Agreed scope changes belong on the final invoice (or on the stage when they were delivered). If they were added as subitems on the project as they were agreed, they are easy to find. If they were agreed by email, they are easy to forget.
Closing the loop. After the final invoice, "billed to date" should equal the total fee plus changes. If it doesn't, something was missed or billed twice. Check before you send.
A worked example
A 20,000 project, billed 30 / 40 / 30, with one agreed change of 1,500:
- Deposit at signing: 6,000 (30% of 20,000).
- Milestone at design approval: 8,000 (40% of 20,000).
- Final at launch: the remaining 6,000 of the original fee, plus the 1,500 change, giving 7,500.
Billed to date: 6,000 + 8,000 + 7,500 = 21,500, which equals 20,000 + 1,500. The arithmetic closes.
Note what did not happen: the final invoice did not bill 20,000 and then deduct 14,000, which is correct too but much harder for a client to read. Whichever form you use, make the numbers easy to follow.
Keeping clients on side
- Put the schedule in the quote. Stages, amounts and triggers, in writing, before work starts.
- Name each invoice by its stage. "Milestone 2: design approval" is easier to approve than "Invoice 0417".
- Show the running total. A line in the notes, such as "Invoiced to date, including this invoice: 14,000 of 20,000", answers the question every client asks.
- Bill changes promptly. A change billed in the month it was delivered gets paid. A change billed months later gets disputed.
Where ColumnLedger fits
ColumnLedger is a planned app, in early access, that will create each stage's invoice from its billing item on your monday.com board, with every subitem as a line, and write the invoice number and paid status back. It is designed so the same item cannot be billed twice by accident. If you bill projects in stages, tell us how you do it; staged billing is one of the workflows we are designing around.